2024-2026 Infrastructure Programs (Proposed)

Project listed have been included in the most recent approved version of the Village’s Long Range Financial Plan. Projects are finalized with the adoption of the Village’s annual operating and capital budget for the respective project year.

2024 Proposed

Southeast Area Combined Sewer Improvements Phase II

2025 Proposed

WisDOT Lake Drive (STH 32) Reconstruction
Sidewalk Replacement Program

2026 Proposed

Oakland Avenue (Capitol to north limits) Reconstruction
Oakland Water Meter Vault Replacement