The objectives of the report included:
- estimate nonpoint source pollution
- estimate stormwater flows and volumes to analyze the storm sewer infrastructure system capacity
- analyze alternative pollution reduction methods and goals to cost effectively achieve nonpoint source pollution reduction
- analyze flooding problems
- develop conceptual layouts of recommend Best Management Practices (BMPs), including preliminary cost estimates
- describe alternative mechanisms for funding stormwater management needs
- develop conceptual solutions to the stormwater runoff and erosion problems at Atwater Park
- develop recommendations for construction erosion control and for managing stormwater runoff post-development for the Edgewood Development